Current Location:

Pile foundation pumping

2025-04-18 16:09

桩基抽芯.jpg

Zhuhai Huafa Pile Foundation Core Extraction Project

Drilling for 8 hours at a depth of 51 meters resulted in a hole inclination of 0.11 measured at a depth of 23 meters. The precise control of hole inclination is much better than that of a vertical drilling rig.