A metal mining exploration project in Urad Middle Banner, Inner Mongolia
Nine 30 degree low angle boreholes were drilled in the field, with a sand and gravel formation construction. The rock and mineral core recovery rate was over 96.79%, and the completed project amount was 730.25 meters. The drilling quality was excellent, and significant mineral exploration results were achieved. The land saving and environmental protection achievements were obvious, and the application prospects were broad, realizing green exploration.