The construction space in the CPD1 exploratory tunnel of the pumped storage power station in wutong Township, Jingning County, Lishui City, Zhejiang Province is narrow, humid and dusty; Using the Ingersoll EP300 portable fully hydraulic drilling rig, we achieved a drilling depth record of 450 meters for a 75 caliber drill and a single shift footage record of 70 meters.